Kudos to the Hyperion team for their hard work in pursuing this project!
Murray Company is delighted to share that since April 1, 2025, we have been serving as the General Contractor on the One-Mile Chamber Pump Station/ Storm Water Discharge Piping Separation Project at the Hyperion Water Reclamation Plant in Playa Del Rey, California. Kudos to the Hyperion team for their hard work in pursuing this project over the course of a year, resulting in our inevitable formal award in December ’24. Our strong relationship with the City of Los Angeles that has been nurtured for years played a big role in this significant award.”
This is a design-build project that includes completion of design through 100% DD for a new pump station in the One-Mile Surge Chamber to drawdown and discharge disinfected secondary effluent back into the facility for treatment as well as upgrades to the plant’s Contaminated Storm Drain and Final Clarifier systems. Our scope includes submersible and vertical turbine pumps, piping, control systems and electrical components, integration, startup and testing.
- Location: Playa Del Rey, CA
- Construction Schedule: 2025-2026
- Scope: Industrial
- Delivery: Design-Build
- Project Type: Wastewater Treatment
- Owner: City of Los Angeles
- General Contractor: Murray Company
- Engineer: Black & Veatch
- Job # 24207
Project Executive & Project Manager
CHRIS GAYDOS
Project Engineer
Superintendent
DAVID CIACCIA
Foreman
Preconstruction Lead
PAUL CENTRONE
Preconstruction Lead
CRAIG KOMATA
Lead Estimator